Cars drive down 21st Ave. in front of Medical Center North. The Werthan Building (at the center of the picture) was built in 1970 and replaced the old entrance to the hospital.
After the completion of the West Court project in 1964, the main hospital entrance shifted to Garland Ave., and the original entrance was replaced with the Werthan Building, which was integrated into the existing Medical Center North (MCN).